News

HIDROSTANK participates in the first edition of BW EXPO 2015 (BRAZIL)

HIDROSTANK, through its distributor FUMINAS, will be present at the first edition of BW EXPO 2015 that will be held in Sao Paulo, Brazil, on 20-22 October 2015 Fuminas presents HIDROSTANK innovative polypropylene access chambers for electrical and telecom ducting that enable the contractor to do the civil construction much faster: • http://www.youtube.com/watch?v=7k6WbfKHZvk HIDROSTANK is a Spanish company with more than 15 years of experience and an increasing activity in Europe, LATAM, Africa, Middle East…
Continue

HIDROSTANK participates in the forthcoming edition of ENERGETAB, Poland

HIDROSTANK will be present at the next edition of ENERGETAB that will be held in Bielsko-Biala, Poland on 15-17 September 2015 Hidrostank presents its innovative polypropylene access chambers for electrical and telecom ducting that enable the contractor to do the civil construction much faster: • http://www.youtube.com/watch?v=7k6WbfKHZvk HIDROSTANK is a spanish company with more than 15 years of experience and an increasing activity in Europe, LATAM, Africa, Middle East… ENERGETAB 2015: 15-17 September 2015 Booth: J 40
Continue

HIDROSTANK SUPPLIES ITS HIDROBOX ATTENUATION CRATES FOR RETENTION TANK IN EYSINES (FRANCE)

This year HIDROSTANK has supplied their HIDROBOX attenuation cells(also known as Storm Cells, Soakaway Modules, and StormCrates) in a project built in EYSINES (FRANCE) HIDROSTANK worked closely with technicians from both the Technical Office and the contractor in the definition of the solution finally adopted. The modularity and ease assembling of HIDOBOX cells, certified by Bureau Veritas, enabled a very quick installation of the 3 retention tanks, of about 125 m3. France is one of several countries where HIDROSTANK is selling their HIDROBOX as a solution for the infiltration/retention of rainwater wherever possible to enable a sustainable urban drainage (SUDS):
Continue

HIDROSTANK CABLE PITS IN SEVERAL SOLAR FARMS IN CHILE

In recent months, HIDROSTANK has supplied, through its distributor TECNORED, its innovative reinforced polypropylene access chambers in several photovoltaic plants have been built in CHILE (Andes Solar, Bellavista Solar, El Olivo, Carrera Pinto, Finis Terrae…) HIDROSTANK and TECNORED have worked closely with technicians of the developer, EPC, and the corresponding civil and electrical contractors to define the Access chambers best solution for electrical and CCTV ducting. For several years HIDROSTANK cooperates in the execution of ground mounted solar and thermosolar projects, where the features and benefits of our access chambers (easy installation and handling, coupled with its great strength) enable the EPC to fulfil, even shorthen in some cases, the demanding deadlines. This project joins the already performed in EUROPE (Spain, UK, Portugal, France, Italy, Czech Republic, Romania, Poland …), LATAM (Chile, Peru, Ecuador…), AFRICA (Mauritania) …
Continue

HIDROSTANK ACCESS CHAMBERS IN PANAMA CANAL – FINAL PHASE OF THE WORKS

Last June the expansion works of Panama Canal entered its final phase with the start of filling the new locks, both the Atlantic and Pacific sectors. The full flood and testing of each lock can take about three to four months. HIDROSTANK has supplied to the awarded joint venture, Grupo Unidos por el Canal (GUPC), its innovative reinforced polypropylene cable pits to the works of the PANAMA CANAL, one of the great engineering feats of the XXI century. The expansion of the Panama Canal will increase by 40% the capacity of transit of goods of existing waterways that link the Atlantic to the Pacific and is part of the integral program to expand the Canal capacity. HIDROSTANK has worked closely with the technicians of the awarded consortium Grupo Unidos por el Canal (GUPC) to define the best solution for the electrical and telecommunications manholes. This project, the first PANAMA, joins the already performed in Europe, South America, Africa and Asia.
Continue

HIDROSTANK successful participation in SITP, Algeria

HIDROSTANK was present at the 12th edition of SITP (International Trade Fair for Public Works and Construction Machinery) that was held in Algiers, Algeria from 19 to 23 November 2014 SARL Algeria Construction; presented HIDROSTANK innovative polypropylene chambers for electrical and telecom ducting that enable the contractor to do the civil construction much faster: • http://www.youtube.com/watch?v=7k6WbfKHZvk HIDROSTANK is a spanish company with more than 15 years of experience and an increasing activity in Europe, LATAM, Africa, Middle East…
Continue

HIDROSTANK successful participation in the last edition of POLLUTEC (FRANCE)

HIDROSTANK was present at the last edition of POLLUTEC (FRANCE) held in LYON from 2nd to 5th of December. 2,257 exhibitors, including over 600 non-French ones from all over the world, were at the show to present their environment and energy solutions. On the visitor front, Pollutec offered a warm welcome to 61,992 visitors, 12% of whom were drawn from 120 countries from outside France. HIDROSTANK presented its wide range of products for: • Chanelling (innovate access chambers, manhole steps, clamps …), highlighting the L1T access chamber with the France Telecom approval • Hydraulic equipment for stormtanks (flow regulators, flushing systems, pass screens, check valves) and, specially, • SUDS: its infiltration cells for sustainable urban drainage systems (SUDS).
Continue

HIDROSTANK SUPPLIES ITS HIDROBOX ATTENUATION CRATES FOR 3 RETENTION TANKS IN BRITTANYS, FRANCE

This year HIDROSTANK has supplied their HIDROBOX attenuation cells(also known as Storm Cells, Soakaway Modules, and StormCrates) in 3 projects in Brittany, FRANCE HIDROSTANK worked closely with technicians from both the Technical Office and the contractor in the definition of the solution finally adopted. The modularity and ease assembling of HIDOBOX cells, certified by Bureau Veritas, enabled a very quick installation of the 3 retention tanks, of about 400 m3. France is one of several countries where HIDROSTANK is selling their HIDROBOX as a solution for the infiltration/retention of rainwater wherever possible to enable a sustainable urban drainage (SUDS):
Continue

HIDROSTANK ACCESS CHAMBERS IN CZERNIKOWO SOLAR FARM, POLAND

This year HIDROSTANK has supplied its innovative reinforced polypropylene access chambers in the PV plant that is now being built in CZERNIKOWO, POLONIA. HIDROSTANK has worked closely with technicians of the developer, EPC, and the corresponding civil and electrical contractors to define the Access chambers best solution for electrical and CCTV ducting. For several years HIDROSTANK cooperates in the execution of ground mounted solar and thermosolar projects, where the features and benefits of our access chambers (easy installation and handling, coupled with its great strength) enable the EPC to fulfil, even shorthen in some cases, the demanding deadlines. This project, the first in Poland, joins the already performed in EUROPE (Spain, UK, Portugal, France, Italy, Czech Republic, Romania …), LATAM (Chile, Peru, Ecuador, Honduras …), AFRICA (Mauritania) …
Continue